As part of an expansion at Pfeifer & Langen GmbH & Co. KG, the sugar factory in Jülich was modernized in collaboration with MBN GmbH. This construction project involved hall extensions with a gross floor area of approximately 13,225 m². The scope of services provided by RSB included a total tonnage of around 1,220 t, divided into supporting, facade, truss, and platform structures in the individual construction phases. The construction phases were divided into a production building with a height of 28.00 m, various storage and production halls, and a 50.00 m long connecting bridge. The building envelopes were clad with trapezoidal sheet metal facades and cassette systems.