Shortly before Christmas 2022, Fehr Lagerlogistik AG from Winterthur (Switzerland) commissioned us to construct a new enclosed automated long goods warehouse. The long goods warehouse is being built at Klöckner Metals Germany GmbH in Würzburg and comprises a steel structure with a total tonnage of 185 tons.
The steel structure consists of a coupled system and includes the actual racking system, to which the external facade substructure is connected. Once our assembly work is complete, the building envelope will be attached on site. The scope of services includes the manufacture, delivery, and assembly of the aforementioned steel structure with a length of 50 m, a width of 11 m, and a height of 20 m.