Rheiner Stahlbau GmbH was commissioned to construct a new turnkey bridge for the Mercedes Benz plant in Rastatt to connect two existing buildings.

To ensure that the construction work did not interrupt ongoing vehicle production, the connecting bridge was assembled at the southern German site over the weekend.

The connecting bridge structure was erected as a steel truss construction on welded steel supports, which were founded on three reinforced concrete foundations. The facade of the bridge consists of metal sandwich panels with a non-combustible insulation layer. The roof, in the form of trapezoidal sheet metal cladding, was also given a non-combustible insulation layer and flat roof waterproofing. The main drainage system is designed as a negative pressure drainage system, while emergency drainage is provided by spouts.

In addition, the roof area contains a total of 15 NRA elements. In addition to its total tonnage of 240 tons, the bridge has a length of approximately 71 m and a width of approximately 11 m. Rheiner Stahlbau completed the construction project in a total of nine months from the start of construction in August 2022.