The construction project was carried out on a turnkey basis in partnership between Rheiner Stahlbau GmbH and MBN GmbH.
Following the groundbreaking ceremony in July 2022, construction of our new administration building began on August 24, 2022. Completed on August 18, 2023, the project provided Rheiner Stahlbau with a modern office building offering 33 offices with space for 75 RSB employees. The offices are distributed across four floors with a gross floor area of 1,800 m². In addition to the offices, which range in size from 15 m² to 42 m², each level provides areas for staff interaction. Three conference rooms and four meeting points, all intentionally oriented toward the canal, create an exceptional working atmosphere.
A key architectural and functional highlight is the bridge, independently designed, manufactured, and installed by RSB, connecting the new building with the existing one. The exposed steel construction, with its tall pylons, underscores the industrial character of RSB in combination with the visible metal façade and glasswork.
True to the motto “from the region for the region,” all major trades were awarded to companies from our local economic area. In January 2023, the first interior works began, along with the installation of the technical building equipment, supported primarily by the in-house TGA department of parent company MBN GmbH. Preliminary planning was also carried out by the group-affiliated design office rohling planung GmbH.