Pedestrian bridge at the BVG training center | Berlin

Bridge to the future

New pedestrian bridge at the BVG training center in Berlin

In July 2022, we at Rheiner Stahlbau were awarded the contract to replace the pedestrian bridge as part of the construction project at the BVG training center in Berlin. The pedestrian bridge connects the “Olympiastadion” subway station with the BVG premises, crossing the adjacent railway tracks.

We were commissioned by Implenia Construction GmbH to manufacture and install the bridge segments with GRP decking and stainless steel handrails, as well as the elevator shaft frame, including glazing. The largest bridge segment, with a length of 36 m, has a total weight of approx. 40 t and was delivered to the construction site in three individual segments. The total scope of work for Rheiner Stahlbau amounted to 167 tons.

Due to high coating requirements (ZTV-ING Part 4 Section 3) and in order to minimize installation damage, the railings and other attachments were already installed at the coating plant. The track system was closed to allow the bridge segments to be lifted into place using a 500-ton truck-mounted crane or a tandem lift with a 500-ton + 250-ton truck-mounted crane. The pedestrian bridge has been open again since the beginning of May 2023.